High-Speed Train Luggage Rack

Precision-machined aluminium profile construction, integrating glass bonding, wiring, coating and final assembly. Tight control of bonding geometry and curing, standardised wiring for reliable electrical performance. Consistent dimensional control across all batches and precise management of assembly step differences guarantee a flush interior fit. Suitable for the vibration environment of high-speed trains, showing Fengshi's expertise in integrated rail interior fabrication.

Manufacturing route: 4 processes in-house

  1. 01CNC Machining CenterMachine
  2. 02Powder CoatingFinish
  3. 03BondingJoin
  4. 04AssemblyIntegrate

No sub-suppliers in this chain. The part never leaves our site between step 01 and dispatch.

On the shop floor: 8 operations in this order

  1. Cutting
  2. CNC milling
  3. powder coating
  4. bonding
  5. wiring
  6. assembly
  7. test
  8. packing

Similar requirement?

Send us the drawing. An engineer answers, not a form letter.

Contact us