Semiconductor Tool Frame

Welded equipment frame covering frame welding, ESD anti-static powder coating, electrical assembly and testing. One of the parts that shows Fengshi's integration depth for semiconductor equipment: structure, surface, wiring and function test from a single source.

Manufacturing route: 8 processes in-house

  1. 01Laser CuttingCut
  2. 02Pressing & BendingForm
  3. 03RivetingJoin
  4. 04CNC Machining CenterMachine
  5. 05WeldingJoin
  6. 06Surface TreatmentFinish
  7. 07Powder CoatingFinish
  8. 08AssemblyIntegrate

No sub-suppliers in this chain. The part never leaves our site between step 01 and dispatch.

On the shop floor: 12 operations in this order

  1. Laser cutting
  2. bending
  3. clinching
  4. machining
  5. welding
  6. grinding
  7. alignment
  8. anodising
  9. powder coating
  10. wiring
  11. assembly
  12. packing

Similar requirement?

Send us the drawing. An engineer answers, not a form letter.

Contact us