Rail Obstacle Deflector
Manufactured to the EN 15085 CL2 railway welding standard. Heavy plate assembly welded with full traceability. Post-weld full machining ensures accurate mounting surfaces and holes to satisfy vehicle assembly geometric tolerances. Complete anti-corrosion coating after machining, meeting adhesion, impact and salt spray requirements for rail outdoor service, showing Fengshi's expertise in large welded rail structural parts.
Manufacturing route: 7 processes in-house
- 01Laser Cutting
- 02Pressing & Bending
- 03Welding
- 04CNC Machining Center
- 05Surface Treatment
- 06Colouring
- 07Assembly
No sub-suppliers in this chain. The part never leaves our site between step 01 and dispatch.
On the shop floor: 9 operations in this order
- Laser cutting
- bending
- welding
- PT test
- CNC milling
- sandblasting
- wet painting
- assembly
- packing
Similar requirement?
Send us the drawing. An engineer answers, not a form letter.
